Naval Industry

CINAR (Argentina´s Industrial Naval Complex) comprised by TANDANOR and Alte. Storni shipyards, is a conglomerate that leads the recovery process of Argentina´s naval activity. With over 140 years of experience, CINAR is one of the major players in the region within the areas of repair and construction of ships and barges of various kinds, topsides and all kinds of large ships..

Strategically located in the south basin of Buenos Aires main commercial port; its top level infrastructure, which harbors the largest Syncrolift in Lationamérica and Alte. Storni´s 55 thousand square meters of covered sheds; together with an internationally reknown and experienced workforce; positions CINAR as the largest naval complex in Argentina.

Within 34 hectares of land, CINAR carries out ship-repair tasks to vessels from all over the world, and ships and barges of the most diverse categories are constructed. Tandanor and Alte. Storni work as a functional unit, serving major shipping companies and oil companies across the globe.

Capabilities

With the aim on enhancing its infrastructure facilities, CINAR has made a significant investemnet in state-of-the-art machinery and equipment in order to maintain its high standads and best practices.

Added to its 55.000 quare meters of covered sheds, its Syncrolift and its six sleepways for driedocking, new technologies were incorporated which enabled the execution of any particularly complex metalworking endeavor..

THE COMPLEX HAS THE CAPACITY TO PROCESS 15,000 TONNES OF STEEL ANNUALLY

With these acquisitions the capacity to process steel has increased up to 15,000 tons of a year. In addition, the complex can now prepare, cut and fold metal plates of different thicknesses, and manufacture curved metal parts, molded and with complex geometric configurations.

Moreover CINAR also sealed partnerships with distinguished companies, with the aim of satisfying all customer needs in the areas of design, engineering and construction for any metal structure. DINCOA, CIMSA, among others, contribute their know-how and experience, hence contributing to execution of major projects.

AVAILABLE EQUIPMENT

Plasma / Oxl Cutting Machi ne with 30 CNC Beveling head.

One 2.200 Ton Hydraulic Press (Bench 5500mm)

1Radial Drlll (Arm Length 1250mm ; Helght 600mm)

4 Roll Synchronized Plate Bending & Rolllng Machine (Max. Plate wldth: 3050 mm: Rotation Power : 125 HP;roller load :800 Tn)

Portable Plasma Cutting Machines (Thickness cap. 22mm)

2 Cylindrlcal Grlnders (Max Pleces Welght: 10Tn; Working lenght 2500mm : Plate 1200 x 1200mm ; Chuck 1000mm)

One 3 Roll Bending Rolling Machine (Max. Plate width: 6000mm)

Automatic oxy-fuel Pipe Beveling Machlne (D.min. 4")

1Milling Machine (Bench shift 700mm;Height 300mm)

One CNC Hydraulic Bending Machlne (Diam max: 168,3 x 10,97mm; Max bending angle:190°)

KODA Heavy duty CNC Parallel Lathe (Chuck diam. 2000 mm; Working length 12000 mm)

1Gear Machine (Dlam. 800mm: Height 500mm)

One 800 Ton Hydraulic Press & Guillotine (Bench 1500mm)

6 Parallel Lathes (Chuck diam. 400 to 800mm; Working length 1500 to 5800mm)

1Slotting machine (Rotary Palte Dlam . 900mm : Lenght 400mm)

CINAR IS CERTIFIED TO PERFOM ALL SORTS OF WELDING

  • Weldings  Standards of universal application (AWS, ASME, DIN, AFNOR)
  • Manual single-wired submerged arc processes with coated electrodes and MIG-MAG with tubular and solid wires, TIG.
  • Fillet joint top type with unprepared (untreated?) edges; Fillet joint top type with preparation in V; ½ V X; J; U; etc.; hardfacing union, pins, etc.

TECHNICAL SERVICES AND TESTING

NON DESTRUCTIVE TESTINGS

  • X-Rays; Gamma Rays; Magnetic Particles lnspection; Liquid penetrant testing.

  • Ultrasonic testing for thickness determination (KRAUTKRAMER y OLYMPUS Equipment)

  • Ultrasonic testing fer failure detection (GE Sean A Screen; Standard and Certified Gages)

  • GE Phases airray Equipment with normal and angular sensor.

  • Qualified Personnel, Certified to perform tests according to Local and international Registers: PNA, RINA, GL, ABS, LR, BV.

DESTRUCTIVE TESTS

  • Hardness tests (1Brinell Teleweld Tester; 1Vikers Schuchardt Tester)

  • Crash, Stress and Metallographic tests

  • Dimmensional Control Equipment

  • Optical level sensor Sokkia Modelo 2614; Laser: Callper Gages; Micrometers. Normalizad Gages.

Repairs

The shipyard Tandanor is CINAR´s area where repairs and naval conversions are performed. Currently the complex receives annually more than 100 vessels from all over the world.

Founded as a Navy Naval Shipyard on November 10, 1879, it has acquired throughout its rich history an important international prestige and, in terms of production capacity, is currently the largest ship repairs yard in Latin America and the third largest in the world.

TANDANOR HAS THE LARGEST SHIP-RISING PLATFORM IN THE REGION - ITS SYNCROLIFT

The Syncrolift is an important competive advantage, as through this rail and lifting system streamlines the shipyard´s working space whilst reducing the average construction times.

0 tn
Lifting Capacity
0 tn
Transfer Capacity
0 m
Beam
0 m
Length

In addition, the yards harbor 1,400 meters of docks and six slipways – 220 m, 178 m, 149 m, 148 m, 80 m and 80 m – for drydocking any type of vessel.

CINAR has a top-level infrastructure, a staff of highly trained professionals, engineers, and technicians to perform all kinds of repair works and conversions

CINAR CATERS TO ALL CLIENTS NEEDS

Port and flying squads repairs • Cargo/ballast tanks coating • Hull treatment (HPWJ, sandblasting, painting) • Thorough appraisals and works on: Propellers (repairs, pollishing and balancing),  main and auxiliary engine (assesment and repair), anchor & anchor chains (assesment and repair) • Refrigeration • Foundry and Machining • Material testing • Piping (repairs, renewal and insulation), shatfline (overhaul, disassemble, shaft seals renewal) • Rudder (overhaul, disassemble and damaged pieces renewal) • Tank cleansing and gas freeing • Carpentry • Gritblasting • Valves (overhaul and repair) • Electric works • Metal Spraying • Underwater appraisals, cleansing and repairs • Steelworks • Offshore units repair.

OFFERS THE FOLLOWING FACILITIES FOR SHIPOWNERS

1400 meters of available piers • Mobile and floating cranes • Shore power and fresh water supply • Office space equiped with telephone and internet connection • Assistance for Custom´s procedures • Shore compressed air • Acetylene • Ballast water supply • Oxygen • Galley garbage disposal • Slop final disposal • Drawing and technical office.

Construction

By the end of 2005, CINAR created the Construction Division with the aim of diversifying its commercial strategy and deliver solutions beyond naval repairs and, expand into building, tugs and barges and other types of vessels.

Consequently, it fostered Almirante Storni facilities, formerly known as the factory of submarines Domecq-Garcia, by purchasing cutting-edge machinery to tackle all necessary aspects for shipbuilding, from hard metal treatment to the ship´s inhabitable areas.

Almirante Storni workshops have a world class infrastructure with 33,000 (roofed) m² essential for activity. The covered sheds with its cranes and multiple services, allow us to work 365 days a year regardless of weather conditions. The workshops have a processing capacity of 15,000 tons of steel a year.

PERFORMED WORKS

The first barge departures from the Compound were the containers «Care», «Conay I» and «Conay II», and the one designed for dry goods, «Float Cristina”; followed by 4 barges type BOX and RAKE delivered to the province of Chaco. Currently, we are building two double hull tank barges for transporting fuel for the Bolivarian Republic of Venezuela.

Also, at CINAR facilities the Damen Stan Tug 2608 was built from scratch, a shooting tugboat for Damen Shipyard Holland, 26 meters long and 8 meters wide. The construction, commissioning and the subsequent harbor tests were performed in yard facilities, and with local labor force. In addition to complying with the class rules, IMO, MARPOL and SOLAS, the tug received the classification of Lloyds Register of Shipping for boats capable of sailing in deep waters in any area and time of year.

0 m2
Roofed area
0 m2
Office space
0 m2
Outside area

SHIPYARD ALMIRANTE STORNI, CONSTRUCTION AREA OF CINAR

The outer lot area has two 75 meters tracks connected to the Syncrolift by the transfer car  that converges with the three main covered sheds.

COVERED-SHED 35

• 206m long
• 34m wide
• 31m high
• 3 bridge cranes: a 100-ton and two others of 50 ton
• 2-way 130m

WAREHOUSE 36

• 206m long
• 29m wide
• 18,85m height
• 2 magnetic cranes of 16 ton, which are used for moving and transfering steel plates.

WAREHOUSE 37

• 110m long
• 29m wide
• 18,85m height
• 1 magnetic crane of 16 ton

In addition, the Alte Storni has eleven auxiliary workshops ranging from 500 to 2,500 m2, each served with bridge cranes able to lift between 5 to 20 tons.